DIVISION 08 - OPENINGS /Portals/109/
|
SECTION: 08 01 52 OPERATION AND MAINTENANCE OF WOOD WINDOWS
|
SECTION: 08 14 00 WOOD DOORS
|
SECTION: 08 52 00 WOOD WINDOWS
|
SECTION: 08 52 70 WOOD WINDOWS - REPAIR AND REHABILITATION
|
|
DIVISION 21 - FIRE PROTECTION
|
SECTION: 21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION
� Fort Lewis Backflow Preventer Form
|
|
DIVISION 22 - PLUMBING
|
SECTION: 22 00 00 PLUMBING, GENERAL PURPOSE
|
|
DIVISION 26 - ELECTRICAL
|
SECTION: 26 51 00 INTERIOR LIGHTING
LUMINAIRE REQUIREMENTS
E_NL-01
E_NL-02
E_NL-03
E_NL-04
E_NL-05
E_NL-06
E_NL-07
E_NL-08
E_NL-09
E_NL-09a
E_NL-10
E_NL-11
E_NL-12
E_NL-13
E_NL-14
E_NL-15
E_NL-16
E_NL-17
E_NL-18
E_NL-19
E_NL-20
E_NL-21
E_NL-22
E_NL-23
E_NL-24
E_NL-25
E_NL-26
Underground Service (Transformer Pad Ground Loop & Power Vault Details)
EUG-01_26 12 19.10
|
|
DIVISION 32 � EXTERIOR IMPROVEMENTS
|
SECTION: 32 01 13.62 ASPALT SURFACE TREATMENT
a. Accessible Parking Markings (R-31)
b. Bicyclist Markings and Sharrow Symbol (R-30)
c. Crosswalk Layout (R-29)
d. Raised Pavement Marker - Fire Hydrant (R-11)
e. Turn Arrow Detail (R-28)
|
SECTION: 32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
Accessible Parking Layouts (R-32)
|