SECTION: 32 17 23 PAVEMENT MARKINGS

 

Criteria

  1. Quality Assurance: EP 415-1-261, Volume 1
  2. UFGS SECTION 32 17 23 PAVEMENT MARKINGS
  3. UFC 3-260-01 AIRFIELD AND HELIPORT PLANNING AND DESIGN
  4. UFC 3-260-04 AIRFIELD AND HELIPORT MARKINGS
  5. AFI 32-1042 Standard for Marking Airfields
  6. FAA Advisory Circular No. 150/5340-1L Standard for Airfield Markings.
  7. Manual on Uniform Traffic Control Devices (MUTCD)
  8. Washington State Department of Transportation (WSDOT)
  9. JBLM installation Regulation 200-1
  10. Farm Security and Rural Investment Act of 2002, Section 9002
  11. Federal Sustainable Acquisition Items/Requirements
  12. DoD Green Procurement Policy (Aug 27 2004)
  13. DoD Green Procurement Strategy (Nov 2008) 
  14. Army Green Procurement Policy (Nov 22 2006) 
  15. Federal Acquisition Regulation,Part 23
  16. USDA BioPreferred Program
  17. ASA IE&E Sustainable Design and Development Policy (Jan 17 2017)  

 

Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)

Paragraph # and Title (if any)

Note to Designer

Change Text

 

 

 

 

 

NOTE: Line marker segments having a 1 to 3 ratio of stripe to gap are standard. Line segments of 10 feet with gaps of 30 feet are recommended. When raised pavement markers are used in lieu of striping, make the line marker segments a 3 to 5 ratio of stripe to gap with line segments of 15 feet with gaps of 25 feet recommended.

 

Design Requirements

None

 

 

Notes to Designers on Drawing Content

None

 

Standard Details

 

�         Accessible Parking Layouts (R-32)

�         Bicyclist Markings and Sharrow Symbol (R-30)

�         Crosswalk Layout (R-29)

�         Raised Pavement Marker - Fire Hydrant (R-11)

�         Turn Arrow Detail (R-28)

 

 

Applicable Points of Contact

Design Standards