SECTION: 07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
 
Criteria

  1. UFGS SECTION 07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
  2. Resource Conservation and Recovery Act (RCRA) , Section 6002
  3. Farm Security and Rural Investment Act of 2002, Section 9002
  4. Federal Sustainable Acquisition Items/Requirements
  5. DoD Green Procurement Policy (Aug 27 2004)
  6. DoD Green Procurement Strategy (Nov 2008)
  7. Army Green Procurement Policy (Nov 22 2006)
  8. Federal Acquisition Regulation, Part 23
  9. USDA BioPreferred Program
  10. EPA Final Guidance on Environmentally Preferable Purchasing
  11. HJB Form 225 (JBLM Sustainable Acquisition Exception Form)
  12. UFC 1-200-2 (High Performance and Sustainable Buildings Requirements)
  13. ASA IE&E Sustainable Design and Development Policy (Jan 17 2017)
 
Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)
 
Paragraph # and Title (if any) Note to Designer Change Text
07 24 00 Exterior Insulation and Finish Systems.docx    

 
 
Design Requirements
Delete Specifications in its entirety.
 
 
Notes to Designers on Drawing Content
Use of EIFS is not recommended in its entirety.
 
 
Standard Details
 
 
Applicable Points of Contact
Design Standards