SECTION: 32 11 23 AGGREGATE BASE COURSE
Criteria
- UFGS SECTION 32 11 23 AGGREGATE BASE COURSE
Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)
Paragraph # and Title (if any) | Note to Designer | Change Text |
| | |
Design Requirements
Any ground disturbing activities will require coordination with the JBLM Stormwater Program Office to ensure compliance with the MS4 permit. At the minimum, erosion and sediment controls must be identified in the Environmental Protection Plan (EPP) submittal prior to construction. If planned ground disturbance is greater than 5,000 square feet, a stormwater Drainage Plan and Stormwater Pollution Prevention Plan (SWPPP) will be required. Please contact the Stormwater office at:
usarmy.jblm.id-readiness.list.dpw-stormwater@army.mil
JBLM Stormwater Design Guidance and Construction SWPPP templates are located on the JBLM Stormwater Website:
https://home.army.mil/lewis-mcchord/index.php/my-Joint-Base-Lewis-Mcchord/all-services/public_works-environmental_division/stormwater
JBLM borrow source area is controlled by the Standard Operating Procedures outlined in the JOINT BASE LEWIS-McCHORD (JBLM) BORROW SOURCE AREA STANDARD OPERATING PROCEDURES memo.
JBLM Borrow Source SOP, 11 Mar 2022
Notes to Designers on Drawing Content
Standard Details
Applicable Points of Contact
Design Standards