SECTION: 31 11 00 CLEARING AND GRUBBING

 

Criteria

  1. UFGS SECTION 31 11 00  CLEARING AND GRUBBING
  2. 31 11 00 Clearing and Grubbing
  3. UFC 3-201-01  Civil Engineering with Change 5

  4. UFC 3 210-10  Low Impact Development

  5. UFC 3-220-01  Geotechnical Engineering

  6. UFC 3200-10N Soil Mechanics

 

Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)

Paragraph # and Title (if any)

Note to Designer

Change Text

 

 

 

 

 

Design Requirements

Any ground disturbing activities will require coordination with the JBLM Stormwater Program Office to ensure compliance with the MS4 permit.  At the minimum, erosion and sediment controls must be identified in the Environmental Protection Plan (EPP) submittal prior to construction.  If planned ground disturbance is greater than 5,000 square feet, a stormwater Drainage Plan and Stormwater Pollution Prevention Plan (SWPPP) will be required. Please contact the Stormwater office at:

 

usarmy.jblm.id-readiness.list.dpw-stormwater@army.mil

 

 

 

JBLM Stormwater Design Guidance and Construction SWPPP templates are located on the JBLM Stormwater Website:

 

https://home.army.mil/lewis-mcchord/index.php/my-Joint-Base-Lewis-Mcchord/all-services/public_works-environmental_division/stormwater

 

 JBLM borrow source area is controlled by the Standard Operating Procedures outlined in the JOINT BASE LEWIS-McCHORD (JBLM) BORROW SOURCE AREA STANDARD OPERATING PROCEDURES memo.

JBLM Borrow Source SOP, 11 Mar 2022

Notes to Designers on Drawing Content

 

 

 

Standard Details

 

 

Applicable Points of Contact

Design Standards