SECTION: 26 27 13.10 30 ELECTRIC METERS
Criteria
- JBLM 26 27 13.10 30 - Electrical Meters.pdf
Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)
Paragraph # and Title (if any) |
Note to Designer |
Change Text |
|
|
|
Design Requirements
- JBLM Design Standards Section 26 27 13.10 30 is applicable to all facility new construction, facility renovation, switchboard/switchgear/MDP replacement/upgrade
Notes to Designers on Drawing Content
Standard Details
Applicable Points of Contact