SECTION: 26 23 00.00 40 SWITCHBOARDS AND SWITCHGEAR
Criteria
- UFGS SECTION 26 23 00.00 40 SWITCHBOARDS AND SWITCHGEAR
- JBLM 26 23 00.00 40 - Switchboards and Switchgear
Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)
Paragraph # and Title (if any) |
Note to Designer |
Change Text |
|
|
|
Design Requirements
- Do not use set-screw type conduit fittings on any type EMT conduit. Install only compression fittings with EMT.
- Provide Arc Flash Study and install PPE level label on each switchboard and switchgear.
- Install #4/0 BC for all grounding system for switchboard and switchgear.
- No shared neutrals between circuits.
- Neutral conductors shall not be derated, they shall be of the same size and quantity as phase conductors.
Notes to Designers on Drawing Content
- Indicate available fault currents of 14,000 AIC minimum for 120/208V and 120/240V panelboards and 22,000 AIC minimum for 277/480V panelboards on power riser diagram.
- Provide "Connected and Demand Load Summary Schedule" on Power Riser Diagram Drawing.
Standard Details
Only the DPW AHJ and/or electrical inspectors as appointees by the AHJ can override the design standards and codes.
Applicable Points of Contact
For all electrical inspections coordinate with:
Mr. Dwayne M. Lee
Senior Construction Control Representative/SCCR
CIB/ESD, Directorate of Public Works
Joint Base Lewis-McChord,WA 98433
Govt. Work Cell: (253)219-8969
Email: dwayne.m.lee.civ@army.mil