SECTION: 26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
Criteria
-
UFGS 26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)
Paragraph # and Title (if any) |
Note to Designer |
Change Text |
|
|
|
Design Requirements
- All cables shall be copper.
- EMT connection shall be compression type.
- Multiwire Branch Circuits not be permitted.
Notes to Designers on Drawing Content
Standard Details
Only the DPW AHJ and/or electrical inspectors as appointees by the AHJ can override the design standards and codes.
Applicable Points of Contact
For all electrical inspections coordinate with:
Mr. Dwayne M. Lee
Senior Construction Control Representative/SCCR
CIB/ESD, Directorate of Public Works
Joint Base Lewis-McChord,WA 98433
Govt. Work Cell: (253)219-8969
Email: dwayne.m.lee.civ@army.mil
Design Standards