SECTION: 13 34 19 METAL BUILDING SYSTEMS

 

Criteria

  1. Quality Assurance: EP 415-1-261, Volume 3  
  2. UFGS SECTION 13 34 19  METAL BUILDING SYSTEMS 
  3. TI 809-30  METAL BUILDING SYSTEMS
  4. Resource Conservation and Recovery Act (RCRA) , Section 6002
  5. Federal Sustainable Acquisition Items/Requirements
  6. DoD Green Procurement Policy (Aug 27 2004)
  7. DoD Green Procurement Strategy (Nov 2008)
  8. Army Green Procurement Policy (Nov 22 2006)
  9. Federal Acquisition Regulation, Part 23
  10. EPA Final Guidance on Environmentally Preferable Purchasing
  11. HJB Form 225 (JBLM Sustainable Acquisition Exception Form)
  12. UFC 1-200-2 (High Performance and Sustainable Buildings Requirements)
  13. ASA IE&E Sustainable Design and Development Policy (Jan 17 2017)

 

Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)

Paragraph # and Title (if any)

Note to Designer

Change Text

1.5 SUBMITTALS

If 01 33 29 is not incorporated in the specifications, change reference to 01 33 29 in this section to instead say 01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS and ensure the additional sustainable acquisition language at paragraphs "Submittals" and "Sustainable Acquisition" of 01 57 19.01 20 is included within that section.

 

1.5 SUBMITTALS

As applicable based on project scope, add the following under "SD-01 Preconstruction Submittals" and "SD-11 Closeout Submittals":

Metal Roof Panels (Recycled Content); S

 

Insulation (Recycled Content); S

 

Interior Insulation (VOC Content); S

 

Interior Sealants and Adhesives (VOC Content); S

2.4 PANEL MATERIALS

[NOTE: In the column to the right, select 01 33 29 when it is incorporated into the specifications, otherwise select 01 57 19.01 20 and ensure it includes added sustainable acquisition language at paragraphs "Submittals" and "Sustainable Acquisition" of that section]

 

Add the following for any metal roof panels to be provided:

Provide roof panels and documentation meeting the requirements at Section [01 33 29 SUSTAINABILITY REPORTING][01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS] paragraph RECYCLED CONTENT. See https://sftool.gov/greenprocurement/green-products/1/construction-materials/231/roofing-materials/0?addon=False and https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for more information.

2.8.3 INSULATION

[NOTE: In the column to the right, select 01 33 29 when it is incorporated into the specifications, otherwise select 01 57 19.01 20 and ensure it includes added sustainable acquisition language at paragraphs "Submittals" and "Sustainable Acquisition" of that section]

 

Add the following for any metal roof panels to be provided:

Provide roof panels and documentation meeting the requirements at Section [01 33 29 SUSTAINABILITY REPORTING][01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS] paragraph RECYCLED CONTENT. See https://sftool.gov/greenprocurement/green-products/1/construction-materia./building-insulation/0?addon=False and https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for more information.

2.8.3 INSULATION

[NOTE: In the column to the right, select 01 33 29 when it is incorporated into the specifications, otherwise select 01 57 19.01 20 and ensure it includes added sustainable acquisition language at paragraphs "Submittals" and "Sustainable Acquisition" of that section]

 

If insulation will be installed inside the building weatherproofing, add the following:

Provide interior application products and documentation meeting the requirements at Section [01 33 29 SUSTAINABILITY REPORTING][01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS] paragraph REDUCE VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING MATERIALS).

2.8.6 JOINT SEALANTS

[NOTE: In the column to the right, select 01 33 29 when it is incorporated into the specifications, otherwise select 01 57 19.01 20 and ensure it includes added sustainable acquisition language at paragraphs 1"Submittals" and "Sustainable Acquisition" of that section]

 

If sealants or adhesives will be installed inside the building weatherproofing, add the following:

Provide interior application products and documentation meeting the requirements at Section [01 33 29 SUSTAINABILITY REPORTING][01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS] paragraph REDUCE VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING MATERIALS).

 

Design Requirements

Metal roof and wall panels on metal buildings for use on JBLM shall be a minimum of 24ga if steel (22ga for uplift pressures in excess of 60psf) or 0.032 inch if aluminum. Color finishes shall be at least 2 mil pvf. The lowest acceptable slope for metal building roofs on JBLM is 2 in 12 - Check with PW PM.

 

 

Notes to Designers on Drawing Content

 

 

Standard Details

 

 

Applicable Points of Contact

Design Standards