SECTION: 11 47 00 ICE MACHINES
 
Criteria

  1. UFGS SECTION 11 47 00 ICE MACHINES
  2. Energy Efficient Equipment Requirements
  3. Federal Sustainable Acquisition Items/Requirements
  4. DoD Green Procurement Policy (Aug 27 2004)
  5. DoD Green Procurement Strategy (Nov 2008)
  6. Army Green Procurement Policy (Nov 22 2006)
  7. Federal Acquisition Regulation, Part 23
  8. Energy Star
  9. 10 CFR 436 Subpart A (Life Cycle Cost Analysis, Energy- and -Water Related Projects)
  10. NIST 135 (Life Cycle Cost Analysis, Energy- and -Water Related Projects)
  11. EPA Final Guidance on Environmentally Preferable Purchasing
  12. HJB Form 225 (JBLM Sustainable Acquisition Exception Form)
  13. UFC 1-200-2 (High Performance and Sustainable Buildings Requirements)
  14. ASA IE&E Sustainable Design and Development Policy (Jan 17 2017)
 
Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)
Paragraph # and Title (if any) Note to Designer Change Text
1.3 SUBMITTALS 01 33 29 is not incorporated in the specifications, change reference to 01 33 29 in this section to instead say 01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS and ensure the additional sustainable acquisition language at paragraphs "Submittals" and "Sustainable Acquisition" of 01 57 19.01 20 is included within that section.  
1.3 SUBMITTALS In addition to its inclusion at SD-11, also include the Energy Star submittal at SD-01 Preconstruction Submittals so the Government can verify proposed items are compliant with legal and policy requirements prior to commencement of work.  

 