SECTION: 10 22 39 FOLDING PANEL PARTITIONS
 
Criteria

  1. UFGS SECTION 10 22 39 FOLDING PANEL PARTITIONS
  2. Resource Conservation and Recovery Act (RCRA) , Section 6002
  3. Farm Security and Rural Investment Act of 2002, Section 9002
  4. Federal Sustainable Acquisition Items/Requirements
  5. DoD Green Procurement Policy (Aug 27 2004)
  6. DoD Green Procurement Strategy (Nov 2008)
  7. Army Green Procurement Policy (Nov 22 2006)
  8. Federal Acquisition Regulation, Part 23
  9. USDA BioPreferred Program
  10. EPA Final Guidance on Environmentally Preferable Purchasing
  11. HJB Form 225 (JBLM Sustainable Acquisition Exception Form)
  12. UFC 1-200-2 (High Performance and Sustainable Buildings Requirements)
  13. ASA IE&E Sustainable Design and Development Policy (Jan 17 2017)
Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)
Paragraph # and Title (if any) Note to Designer Change Text
1.2 SUBMITTALS If 01 33 29 is not incorporated in the specifications, change reference to 01 33 29 in this section to instead say 01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS and ensure the additional sustainable acquisition language at paragraphs "Submittals" and "Sustainable Acquisition" of 01 57 19.01 20 is included within that section.  
1.2 SUBMITTALS  As applicable based on project scope, add the following under "SD-01 Preconstruction Submittals" and "SD-11 Closeout Submittals": Particleboard (Recycled Content); S
 
Particleboard (VOC Content); S
 
Composite Panels (Biobased Content); S
 
Composite Panels (VOC Content); S
 
Finish Covering (VOC Content); S
 
1.3.1 INDOOR AIR QUALITY CERITIFICATIONS The same requirements identified for a finish covering would apply to composite panels, particleboard, and other non-metal bonded panel materials. If using such materials, include appropriate language to ensure compliance with ASHRAE 189.1 Section 8.4.2 or 8.5.2.  
2.3.1 PANELS [NOTE: If 01 33 29 is not being incorporated into the specifications, select 01 57 19.01 20 instead and ensure the added sustainable acquisition is included at paragraphs "Submittals" and "Sustainable Acquisition" of that section]
 
If specifying/allowing supply or use of composite panels, include the following:
Provide products and documentation in accordance with Section [01 33 29 SUSTAINABILITY REPORTING][01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS] paragraph BIO-BASED PRODUCTS. See https://sftool.gov/greenprocurement/green-products/3/building-finish./composite-panels/0?addon=False and https://www.biopreferred.gov/BioPreferred/ for more information.
2.3.1 PANELS [NOTE: If 01 33 29 is not being incorporated into the specifications, select 01 57 19.01 20 instead and ensure the added sustainable acquisition is included at paragraphs "Submittals" and "Sustainable Acquisition" of that section]
 
If specifying/allowing supply or use of particleboard, include the following:
Provide products and documentation in accordance with Section [01 33 29 SUSTAINABILITY REPORTING][01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS] paragraph RECYCLED CONTENT. See https://sftool.gov/greenprocurement/green-products/3/building-finishes/251/structural-fiberboard/0?addon=False and https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for more information.

 
Design Requirements
 
 
Notes to Designers on Drawing Content
 
 
Standard Details
 
 
Applicable Points of Contact
Design Standards