SECTION: 09 72 00 WALL COVERINGS
 
Criteria

  1. UFGS SECTION 09 72 00 WALL COVERINGS
  2. Federal Sustainable Acquisition Items/Requirements
  3. DoD Green Procurement Policy (Aug 27 2004)
  4. DoD Green Procurement Strategy (Nov 2008)
  5. Army Green Procurement Policy (Nov 22 2006)
  6. Federal Acquisition Regulation, Part 23
  7. EPA Final Guidance on Environmentally Preferable Purchasing
  8. HJB Form 225 (JBLM Sustainable Acquisition Exception Form)
  9. UFC 1-200-2 (High Performance and Sustainable Buildings Requirements)
  10. ASA IE&E Sustainable Design and Development Policy (Jan 17 2017)
Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)
Paragraph # and Title (if any) Note to Designer Change Text
1.2 SUBMITTALS If 01 33 29 is not incorporated in the specifications, change reference to 01 33 29 in this section to instead say 01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS and ensure the additional sustainable acquisition language is included within that section.  
1.2 SUBMITTALS As applicable based on project scope, also incorporate 'S' submittals located at SD-11 under SD-01 Preconstruction Submittals so the Government can verify legal and policy compliance prior to work commencing.  
1.2 SUBMITTALS As applicable based on project scope, also incorporate 'S' submittals located at SD-11 under SD-01 Preconstruction Submittals so the Government can verify legal and policy compliance prior to work commencing.  
2.1 WALL COVERINGS Specify material requirements and make selections to comply with ASHRAE Standard 189.1, section 8.4.2 or 8.5.2.  
2.10 PRIMER AND ADHESIVE Specify material requirements and make selections to comply with ASHRAE Standard 189.1, section 8.4.2 or 8.5.2.  

 
Design Requirements
 
 
Notes to Designers on Drawing Content
 
 
Standard Details
 
 
Applicable Points of Contact
Design Standards