SECTION: 08 11 13 STEEL DOORS AND FRAMES
 
Criteria
  1. UFGS SECTION 08 11 13 STEEL DOORS AND FRAMES
  2. Resource Conservation and Recovery Act (RCRA) , Section 6002
  3. Federal Sustainable Acquisition Items/Requirements
  4. DoD Green Procurement Policy (Aug 27 2004)
  5. DoD Green Procurement Strategy (Nov 2008)
  6. Army Green Procurement Policy (Nov 22 2006)
  7. Federal Acquisition Regulation, Part 23
  8. EPA Final Guidance on Environmentally Preferable Purchasing
  9. HJB Form 225 (JBLM Sustainable Acquisition Exception Form)
  10. UFC 1-200-2 (High Performance and Sustainable Buildings Requirements)
  11. ASA IE&E Sustainable Design and Development Policy (Jan 17 2017)
  12. 10 CFR 436 Subpart A (Life Cycle Cost Analysis, Energy- and -Water Related Projects)
  13. NIST 135 (Life Cycle Cost Analysis, Energy- and -Water Related Projects)
  14. OMB Circular A-94 (Life Cycle Cost Analysis, Non-Energy and -Water Related Projects)
  15. Tri-Services MOA (Life Cycle Cost Analysis, MILCON)
 
Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)
Paragraph # and Title (if any) Note to Designer Change Text
1.2 SUBMITTALS If 01 33 29 is not incorporated in the specifications, change reference to 01 33 29 in this section to instead say 01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS and ensure the additional sustainable acquisition language is included within that section.  
1.2 SUBMITTALS Add the following under "SD-01 Preconstruction Submittals" and "SD-11 Closeout Submittals": Insulation Cores (Recycled Content); S
2.6 INSULATION CORES [NOTE: In the column to the right, select 01 33 29 when it is incorporated into the specifications, otherwise select 01 57 19.01 20 and ensure it includes added sustainable acquisition language]
 
Add the following:
Provide products and documentation in accordance with Section [01 33 29 SUSTAINABILITY REPORTING][01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS] paragraph RECYCLED CONTENT. For more information see https://sftool.gov/greenprocurement/green-products/1/construction-materials/22/building-insulation/0?addon=False and https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program.
 
 
Design Requirements
 
 
Notes to Designers on Drawing Content
 
 
Standard Details
 
 
Applicable Points of Contact
Design Standards