SECTION: 02 41 00 [DEMOLITION][ AND ][DECONSTRUCTION]
Criteria
- UFGS SECTION 02 41 00 [DEMOLITION][ AND ][DECONSTRUCTION]
- Army Regulation 420-1, 24 August 2012, ARMY FACILITIES MANAGEMENT, Chapter 23, Section III: Non-Hazardous Solid Waste Management
- Public Works Technical Bulletin 200-1-120, Opportunities to Increase Construction and Demolition Waste Diversion (includes current DoD diversion targets)
- UFC 1-200-02 (High Performance and Sustainable Buildings Requirements)
- ASA IE&E Sustainable Design and Development Policy (Jan 17 2017)
- HJB Form 224, JBLM Borrow Source Area Use Authorization
Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)
02 41 00 - [Demolition][ and ][Deconstruction].pdf
Add:
3.1.2.3: Abandon Existing Manholes
Where it is required that an existing manhole be abandoned, the Structure shall be broken down to a depth of at least 4 feet below the revised surface elevation, all connections plugged, and the manhole filled with sand and compacted to 90 percent density. Debris resulting from breaking the upper part of the manhole may be mixed with the sand subject to the approval of the Engineer. The ring and cover shall be salvaged, and all other surplus material disposed of.
For a copy of this section in SpecsIntact format (.sec), send a request to
usarmy.jblm.id-readiness.list.dpw-green-procurement@army.mil
Design Requirements
Notes to Designers on Drawing Content
Standard Details
Applicable Points of Contact
Design Standards