SECTION: 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
Criteria
- UFGS SECTION 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
- Army Regulation 420-1, 24 August 2012, ARMY FACILITIES MANAGEMENT, Chapter 23, Section III: Non-Hazardous Solid Waste Management
- Public Works Technical Bulletin 200-1-120, Opportunities to Increase Construction and Demolition Waste Diversion (includes current DoD diversion targets)
- UFC 1-200-02 (High Performance and Sustainable Buildings Requirements)
- ASA IE&E Sustainable Design and Development Policy (Jan 17 2017)
- HJB Form 229 (C&D Diversion-Disposal Transaction Report)
- HJB Form 229 Instructions
Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)
01 74 19 - Construction Waste Management and Disposal.pdf
For a copy of this file in SpecsIntact format (.sec), send a request to usarmy.jblm.id-readiness.list.dpw-green-procurement@army.mil
Design Requirements
Notes to Designers on Drawing Content
Standard Details
Applicable Points of Contact
Design Standards