SECTION: 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

 

Criteria

  1. UFGS SECTION 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
  2. Army Regulation 420-1, 24 August 2012, ARMY FACILITIES MANAGEMENT, Chapter 23, Section III: Non-Hazardous Solid Waste Management
  3. Public Works Technical Bulletin 200-1-120, Opportunities to Increase Construction and Demolition Waste Diversion (includes current DoD diversion targets)
  4. UFC 1-200-02 (High Performance and Sustainable Buildings Requirements)
  5. ASA IE&E Sustainable Design and Development Policy (Jan 17 2017)
  6. HJB Form 229 (C&D Diversion-Disposal Transaction Report)
  7. HJB Form 229 Instructions

 

Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)

 

01 74 19 - Construction Waste Management and Disposal.pdf

For a copy of this file in SpecsIntact format (.sec), send a request to usarmy.jblm.id-readiness.list.dpw-green-procurement@army.mil

 

 

 

 

Design Requirements

 

Notes to Designers on Drawing Content

 

Standard Details

 

Applicable Points of Contact
 

Design Standards