SECTION: 01 45 00.00 10 QUALITY CONTROL
Criteria
- UFGS SECTION 01 45 00.00 10 QUALITY CONTROL
- Federal Sustainable Acquisition Items/Requirements
- EPA Final Guidance on Environmentally Preferable Purchasing
Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)
Paragraph # and Title (if any) | Note to Designer | Change Text |
Part 2 Products | Add the following. Include the bracketed text if 01 33 29 is incorporated into the specs: | Include procedures in the contractor QC program to ensure compliance with Federal and JBLM hazardous material, sustainable acquisition, and sustainable design requirements. See Section[s] 01 57 19.01 20 [and Section 01 33 29] for more information on these requirements. |
3.2.1 Content of the CQC Plan | Add the following to item b: | This includes the Contractor's/subcontractor's Environmental Officer(s). |
3.2.1 Content of the CQC Plan | Add the following to item g: | This includes procedures for ensuring compliance with Federal and JBLM environmental requirements, including hazardous materials, sustainable acquisition, and Environmental Management System. |
3.6.1 Preparatory Phase | Add the following to item c: | This includes assurance that materials meet Federal and JBLM hazardous material and sustainable acquisition requirements. |