SECTION: 01 33 29 SUSTAINABILITY REPORTING
 
 
Criteria
 

  1. UFGS Section 01 33 29 SUSTAINABILITY REPORTING
  2. Resource Conservation and Recovery Act (RCRA) , Section 6002
  3. Farm Security and Rural Investment Act of 2002, Section 9002
  4. Federal Sustainable Acquisition Items/Requirements
  5. DoD Green Procurement Policy (Aug 27 2004)
  6. DoD Green Procurement Strategy (Nov 2008)
  7. Army Green Procurement Policy (Nov 22 2006)
  8. Federal Acquisition Regulation, Part 23
  9. USDA BioPreferred Program
  10. EPA Comprehensive Procurement Guidelines
  11. FEMP
  12. Energy Star
  13. EPEAT
  14. WaterSense
  15. EPA SNAP
  16. EPA Final Guidance on Environmentally Preferable Purchasing
  17. HJB Form 225 (JBLM Sustainable Acquisition Exception Form)
  18. UFC 1-200-2 (High Performance and Sustainable Buildings Requirements)
  19. ASA IE&E Sustainable Design and Development Policy (Jan 17 2017)
  20. CITES information
  21. CITES timber species
  22. Forest Stewardship Council (FSC)
  23. 10 CFR 436 Subpart A (Life Cycle Cost Analysis, Energy- and -Water Related Projects)
  24. NIST 135 (Life Cycle Cost Analysis, Energy- and -Water Related Projects)
  25. OMB Circular A-94 (Life Cycle Cost Analysis, Non-Energy and -Water Related Projects)
  26. Tri-Services MOA (Life Cycle Cost Analysis, MILCON)

 
Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)
 
01 33 29 - SUSTAINABILITY REPORTING.pdf
 
For a copy of this section in SpecsIntact format (.sec), send a request to usarmy.jblm.id-readiness.list.dpw-green-procurement@army.mil .
 
 
Design Requirements
 
All design shall comply with the sustainable design and development laws and policies referenced in the criteria section above.
 
 
Notes to Designers on Drawing Content
 
 
Standard Details
 
 
Applicable Points of Contact
Design Standards