SECTION: 01 33 00 SUBMITTAL PROCEDURES

 

Criteria

  1. In lieu of Unified Facilities Guide Specifications section 01 33 00, use the following edited sections:
  2. Click the hyperlinked file to access an MS Word version (.doc) of SUBMITTALS Section 01 33 00.
  3. Click the hyperlinked file to access a SPECSINTACT version (.zip) of SUBMITTALS Section 01 33 00.
  4. Click the hyperlinked file to access a PDF version (.pdf) the SUBMITTALS Section 01 33 00.

 

Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)

Paragraph # and Title (if any)

Note to Designer

Change Text

 

Design Requirements

 

 

Notes to Designers on Drawing Content

 

 

Standard Details

 

 

Applicable Points of Contact

Design Standardselect "Edit Content" from the Edit (Pencil Icon) Action Menu.