SECTION: 08 52 00 WOOD WINDOWS
 
Criteria

  1. Quality Assurance: EP 415-1-261, Volume 3
  2. UFGS SECTION 08 52 00 WOOD WINDOWS    
  3. NFPA 80 Fire Doors and Windows    
  4. NFPA 101 Safety to Life From Fire in Buildings and Structures    
  5. NWWDA I.S.2 Wood Windows    
  6. Manual for Maintenance and Repair For Historic Structures
  7. Resource Conservation and Recovery Act (RCRA) , Section 6002
  8. Farm Security and Rural Investment Act of 2002, Section 9002
  9. Federal Sustainable Acquisition Items/Requirements
  10. DoD Green Procurement Policy (Aug 27 2004)
  11. DoD Green Procurement Strategy (Nov 2008)
  12. Army Green Procurement Policy (Nov 22 2006)
  13. Federal Acquisition Regulation, Part 23
  14. USDA BioPreferred Program
  15. Energy Star
  16. EPA Final Guidance on Environmentally Preferable Purchasing
  17. HJB Form 225 (JBLM Sustainable Acquisition Exception Form)
  18. UFC 1-200-2 (High Performance and Sustainable Buildings Requirements)
  19. ASA IE&E Sustainable Design and Development Policy (Jan 17 2017)
  20. 10 CFR 436 Subpart A (Life Cycle Cost Analysis, Energy- and -Water Related Projects)
  21. NIST 135 (Life Cycle Cost Analysis, Energy- and -Water Related Projects)
  22. OMB Circular A-94 (Life Cycle Cost Analysis, Non-Energy and -Water Related Projects)
  23. Tri-Services MOA (Life Cycle Cost Analysis, MILCON)
  24. CITES information
  25. CITES timber species
  26. Forest Stewardship Council (FSC)
Changes or Criteria Notes to Unified Facilities Guide Specifications (UFGS)
Paragraph # and Title (if any) Note to Designer Change Text
1.2 SUBMITTALS If 01 33 29 is not incorporated in the specifications, change reference to 01 33 29 in this section to instead say 01 57 19.01 20 TEMPORARY ENVIRONMENTAL CONTROLS and ensure the additional sustainable acquisition language at 01 57 19.01 20 is included within that section.  
1.2   SUBMITTALS Change the title for the VOC submittal at SD-11 to the following (as applicable to project scope) and also include it under "SD-01 Preconstruction Submittals".  Ensure VOC submittals for interior paints and coatings, as required at 01 33 29/01 57 19.01 20, are incorporated at 09 90 00. Ensure the same for interior joint sealants at 07 92 00: [Engineered Wood,] [Interior Adhesives,] [and] [Interior Vinyl Cladding] (VOC Content); S
1.2 SUBMITTALS Also include the energy efficiency submittal at SD-11 under "SD-01 Preconstruction Submittals" so the Government can verify compliance of proposed materials with legal and policy requirements prior to commencement of work.  
1.2 SUBMITTALS Add the following under "SD-01 Preconstruction Submittals" and "SD-11 Closeout Submittals": Wood Window Components (Certified Sustainable Wood); S
2.1 PRODUCT SUSTAINABILITY CRITERIA Delete "For products in this section, where applicable and to extent allowed by performance criteria, provide and document the following:" The language at 01 33 29/01 57 19.01 20 allows for exceptions based on performance criteria, as long as adequate justification per the applicable legal or policy requirement is provided on HJB Form 225.  
2.1.1 REDUCED VOC'S FOR WINDOW MATERIALS [NOTE: In the column to the right, select 01 33 29 when it is incorporated into the specifications, otherwise select 01 57 19.01 20 and ensure it includes added sustainable acquisition language]
 
 
Revise language as follows:
Provide products and documentation in accordance with Section [01 33 29 SUSTAINABILITY REPORTING][01 57 19.01 20 TEMPORARY ENVIRONMENTAL CONTROLS] paragraph REDUCE VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING MATERIALS).
2.1.2 ENERGY EFFICIENT EQUIPMENT FOR RESIDENTIAL WINDOWS [NOTE: In the column to the right, select 01 33 29 when it is incorporated into the specifications, otherwise select 01 57 19.01 20 and ensure it includes added sustainable acquisition language]
 
Revise as follows:
Provide Energy Star residential windows in accordance with Section [01 33 29 SUSTAINABILITY REPORTING][01 57 19.01 20 TEMPORARY ENVIRONMENTAL CONTROLS] paragraph ENERGY EFFICIENT PRODUCTS.
2.1.3 CERTIFIED SUSTAINBLY HARVESTED WOOD [NOTE: In the column to the right, select 01 33 29 when it is incorporated into the specifications, otherwise select 01 57 19.01 20 and ensure it includes added sustainable acquisition language]
 
Create this section and add the following:
 Provide products and documentation in accordance with Section [01 33 29 SUSTAINABILITY REPORTING][01 57 19.01 20 TEMPORARY ENVIRONMENTAL CONTROLS] paragraph SUSTAINABLY CERTIFIED WOOD.
2.2.1 VIRGIN LUMBER Add the following to the paragraph: Virgin lumber products shall not contain wood from endangered wood species unless the trade of such wood conforms to the requirements of the Convention on International Trade in Endangered Species of Wild Fauna and Flora (CITES). 
2.2.2 ENGINEERED WOOD PRODUCTS Ensure compliance with 2.1.1.  Include the following selections here: Products cannot contain added urea-formaldehyde.
 
Products must not be used if formaldehyde concentration is greater than 9 ug/m3.
2.4.1 ADHESIVES Ensure compliance with 2.1.1.  If 01 33 29 is not incorporated, change the referenced section to 01 57 19.01 20 and ensure it includes the additional sustainable acquisition language. Address VOC submittals for interior joint sealants at 07 92 00.  
2.5 FINISHES Ensure compliance with 2.1.1.   
2.5.1 PAINT Ensure VOC and recycled/biobased content submittals, as required at 01 33 29/01 57 19.01 20, are incorporated at 09 90 00.  
2.5.2 Vinyl (PVC) Cladding [NOTE: PVC is not a sustainable material and is included on various construction material red lists.  In accordance with FAR 23.7, more environmentally preferable options should be selected whenever practicable. In addition, ensure preservative treatments are as low/non-toxic as practicable.  Such treatments should not contain carcinogens.  
 
Design Requirements
a.  Where new or replacement windows are required at buildings in the Joint Base Lewis-McChord Historic District, AE's shall refer to "Maintenance and Repair Manual For Historic Structures at Fort Lewis, Washington", Section 7.0. Wood windows replaced or added in structures within the Fort Lewis Historic District must also conform as closely as possible to existing (see attached sketches for examples). The use of vinyl or aluminum clad window types for replacement in historic buildings is not recommended. Any consideration of replacement types other than "in-kind" wood must first be coordinated with the State Historic Preservation Officer through Environmental and Natural Resources Division, Public Works, Joint Base Lewis-McChord.
 
b.  Any repairs to existing wood windows to remain must be made carefully. A historic color analysis may be directed by PW before any paint removal. The A-E is also reminded of the likelihood of lead in old paint coatings. The specification should identify this probability and refer the contractor to the appropriate specification section for abatement. Acceptable removal methods include water soluble chemical strippers, hot air gun or heat plate. Use no open flame or sharp chisels/scrapers. Old glass is particularly susceptible to breakage when heated. See UFGS 08 52 70 for wood restoration techniques before repainting. Any broken glazing lites in historic windows should be replaced using existing similar pieces of glass from salvaged windows, if possible. If such assets are not available, use similar glass, with waviness or imperfections matching adjacent glazing as closely as possible. The A-E is reminded of the likelihood of asbestos in old window putty. The specification should identify this probability and refer the contractor to the appropriate specification section for abatement. Do not install felt weatherstripping, it retains moisture near the wood. Avoid vinyl, foam and surface mounted type weatherstripping. 
 
 